ABC MEMBER:
 
Allied Mechanical Services, Inc.
   
CLIENT:
 
Abbott Laboratories
   
LOCATION:
 
Sturgis, MI
   
PROJECT:
 
Utilities Expansion - Ross Products Division
   
DESIGN:
 
MSD Engineering
   
CONTRACT:
 
Competitively Bid
   
TOTAL COST:
 
$1.5 million
   
UNIQUE FEATURES:
 
The project was designed to support the latest manufacturing expansion in Sturgis. The project involved the installation of a new 80,000 pounds per hour, dual fired boiler rated at 600 pounds pressure. In addition to the boiler installation, a new 40,000-gallon, above ground oil storage tank was installed, as well as a new feed water system, de-gassifier, de-alkalizer, turbine pump, economizer, necessary instrumentation, and a system of catwalks for serviceability.