Most of the pipe was pre-fabricated in Allied's pipe fabrication facility, cutting down on field installation time. This project included the installation of two 800 HP boilers and one 300 HP boiler, pre-purchased by the owner.
JUDGES' COMMENTS:
"Very nice installation. Plenty of maintenance space."