ABC MEMBER:
 
Allied Mechanical Services, Inc.
   
CLIENT:
 
Andrews University
   
LOCATION:
 
Berrien Springs, MI
   
PROJECT:
 
Andrews University Power House
   
DESIGN:
 
WW Engineering and Science
   
CONTRACT:
 
Guaranteed Maximum
   
TOTAL COST:
 
$600,000
   
UNIQUE FEATURES:  
Most of the pipe was pre-fabricated in Allied's pipe fabrication facility, cutting down on field installation time. This project included the installation of two 800 HP boilers and one 300 HP boiler, pre-purchased by the owner.
     
JUDGES' COMMENTS:
 
"Very nice installation. Plenty of maintenance space."

"Well laid out. Extremely neat and clean."

"Well piped and insulated."